1.0
IT hiring
SAP PI/PO Ends in 2027: The Integration Talent Pharma Needs for SAP Integration Suite
SAP PI/PO leaves mainstream maintenance on December 31, 2027, the same day as SAP ECC, and SAP's replacement is SAP Integration Suite. By November 2026, SAP said about 3,400 of its 14,400 PI/PO customers had moved, which leaves roughly three in four still to go. For a pharma company, that means every interface between SAP and your LIMS, MES, quality, serialization and commercial systems has to be rebuilt, tested and shown to move GxP data correctly, by people who understand both the old platform and the new one.

1.1
The deadline
What actually ends on December 31, 2027
Below: what ends and when, why pharma interfaces are harder to move, the roles a migration needs, and when to start hiring so the people are in place before the date.
SAP Process Orchestration 7.5 reaches the end of mainstream maintenance on December 31, 2027. After that, customers can pay for optional extended maintenance through December 31, 2030. SAP has said no new features will ship after the mainstream cutoff. From 2031, PI/PO moves to customer-specific maintenance with no follow-on release, so there is no newer version of PI/PO to upgrade to. The only way forward is a different integration platform, and for most SAP customers that is SAP Integration Suite, the cloud integration service on SAP Business Technology Platform (BTP). Its core is Cloud Integration, still widely called CPI.
| Date | What happens | What it means for you |
|---|---|---|
| December 31, 2027 | Mainstream maintenance for PI/PO 7.5 ends | No new features. Same date as SAP ECC mainstream maintenance |
| Through December 31, 2030 | Optional extended maintenance, at extra cost | Buys time, but the migration still has to happen |
| From 2031 | Customer-specific maintenance only, no follow-on release | No supported PI/PO version to move to |
Paying for extended maintenance moves the deadline. It does not remove the work, and it puts your integration project in the same window as everyone else who waited. The same timing problem applies to ERP: we cover the S/4HANA side in SAP S/4HANA staffing before 2027.
Sources: SAP Community, What SAP PI/PO customers need to know about the 2030 timeline (October 7, 2026); SAP Community, SAP Integration Suite roadmap Q4 2026 (November 18, 2026); SAP News, Planning beyond 2030 (October 7, 2026).
1.2
The backlog
How many companies still have to move
SAP's own roadmap post in November 2026 put PI/PO customers at 14,400, with about 3,400 already on Integration Suite. That leaves around 11,000 companies with an integration layer still to migrate in about two years, or five if they pay for extended maintenance.
Integration is also wider than it looks from the SAP side. In ASUG and SAP research published in 2026, 88% of SAP customers said they were involved in integration projects, and the average customer connected SAP to 18 other applications. The top challenge respondents named was a lack of internal skills and resources, cited by 43%, ahead of budget.
SAP has built tools to help. The Migration Assessment estimates the effort for each scenario, and the Migration Tool inside Cloud Integration moves interfaces semi-automatically. In 2026 SAP added mass migration of up to 10 scenarios at once and an AI agent that converts Java mappings into Groovy scripts. SAP is also clear about the limits. Its own documentation says some scenarios cannot be migrated automatically because of unsupported configurations or features Integration Suite does not have, and that migration can require manual adaptation or redesign. The tools shorten the work. They do not replace the people who check it.
Sources: SAP Community, SAP Integration Suite roadmap Q4 2026 (November 18, 2026); SAP, 2026 Integration Research with ASUG (February 2026, survey of 142 customers, November 2025); SAP Community, What's new in 2026: from migration tooling to modernization (November 26, 2026); SAP Architecture Center, Migrate SAP PI/PO to SAP Integration Suite (October 28, 2026).
1.3
Why pharma is different
Interfaces that carry GxP data
At a retailer, a broken interface means a late order. In pharma, an interface may carry batch records, test results, material status or serialization data, and regulators treat that data as part of your quality system.
US drug GMP rules require appropriate controls over computer systems so that changes to records are made only by authorized people, and they require that input to and output from those systems be checked for accuracy. The EU's Annex 11 says computerised systems that exchange data electronically with other systems should include built-in checks for the correct and secure entry and processing of data. An interface that moves GxP data is part of a validated process. Rebuilding it on a new platform is a change, and the change has to be assessed, tested and documented like any other.
That is what makes a pharma PI/PO migration slower than the same migration elsewhere. A typical SAP system in a drug company connects to:
- Laboratory systems (LIMS) that send results back to SAP for batch release
- Manufacturing execution systems (MES) that exchange process orders and batch data
- Serialization and track-and-trace systems that report serial numbers to partners
- Quality and document systems such as Veeva Vault
- Distributors, contract manufacturers and 3PLs through EDI and B2B connections
Each of those flows needs someone who can rebuild it in Integration Suite and someone who can prove it still does exactly what it did before. Often those are different people, and both are in short supply. Our article on GxP and IT validation hiring covers the validation side in more depth.
Sources: eCFR, 21 CFR 211.68, Automatic, mechanical, and electronic equipment; European Commission, EudraLex Volume 4, Annex 11: Computerised Systems.
1.4
The roles
Who a PI/PO to Integration Suite migration needs
The team depends on how many interfaces you have and how many are custom. Most pharma migrations draw on the same group of roles.
| Role | What they do | When you need them |
|---|---|---|
| Integration architect (BTP) | Designs the target setup on Integration Suite, sets patterns and decides what to rebuild, redesign or retire | From the assessment, before any interface moves |
| Integration Suite (CPI) developer | Rebuilds interfaces as integration flows, rewrites mappings in Groovy, configures adapters | Throughout the build and test waves |
| PI/PO specialist | Explains how the existing interfaces really work, including undocumented logic | Early, while the people who built them are still around |
| BTP platform or Basis engineer | Sets up sub-accounts, Cloud Connector, certificates and security | Before development starts and through go-live |
| API Management or Event Mesh specialist | Handles APIs and event-driven integrations that PI/PO never did | If you are modernizing rather than copying |
| CSV or validation engineer | Assesses GxP impact, writes and runs the test evidence, keeps records audit-ready | From the assessment through each validated release |
| Integration support engineer | Runs and monitors Integration Suite after go-live | Permanent, from the first live wave |
Two of these roles do the most to set the pace. The CPI developer who understands both platforms decides how fast interfaces move, and the validation engineer decides how fast they can go live in a GxP system. If you are short on either, the project slows down however good the rest of the team is.
1.5
Why these hires are hard
Two skill sets that rarely sit in one person
The problem is not a lack of SAP people in general. It is the overlap. A developer with ten years of PI/PO knows message mappings, adapters and the quirks of your setup, but Integration Suite works differently: it uses Groovy scripting, cloud connectivity and certificates. SAP itself describes migrating Java mappings as work that needs dual expertise in Java mappings for PI/PO and Groovy for Cloud Integration. A younger cloud developer knows Integration Suite but has never seen why an interface was built the way it was in 2012.
Pharma narrows the pool again. A candidate who has moved interfaces at a manufacturer or retailer may never have worked under change control, written test evidence for an auditor, or handled data covered by Part 11. That experience is hard to judge from a CV, because most CVs list "CPI" and "PI/PO" without saying whether the work was validated.
Then there is timing. The integration migration runs into the same December 2027 date as S/4HANA, so the same SAP specialists are being pursued by ERP programs, consultancies and every other company still running PI/PO. The best people tend to be booked well ahead, often through the consultancies, before a company has written its job description.
This is the screening Geeqers does on every SAP search: checking what a candidate actually built, on which platform, and whether it was in a validated environment. Our SAP staffing for pharma page lists the roles we fill.
1.6
Permanent or contract
How to staff the migration and what comes after
A PI/PO migration has a clear shape: a fixed amount of work, a deadline and a peak in the middle. That suits contractors for the build and test waves. What comes after does not end. Integration Suite needs people to run it, monitor it and add new interfaces as the business changes, which is permanent work.
| Need | Usually better as |
|---|---|
| Integration architect who will own the platform | Permanent |
| Extra CPI developers for the build and test waves | Contract |
| PI/PO specialist to explain legacy interfaces | Contract, for the migration period |
| Validation engineer for the migration releases | Contract, or permanent if your CSV team is already stretched |
| Integration support after go-live | Permanent |
Many companies combine the two: permanent hires to own the platform, plus contractors who leave once the last wave is live. We explain how contractors work under GxP in IT staff augmentation for pharma. Geeqers places both. Either way you get a shortlist in 7 business days and a 90-day replacement, and for a permanent hire there is no fee until the person starts.
1.7
Timeline
When to start hiring for a 2027 cutover
Work back from the date. Migrations rarely go live in one big cutover. They move in waves, and the last wave needs to be tested and released before December 31, 2027, with the validation evidence complete.
| When | What should be happening | People you need in place |
|---|---|---|
| Now to early 2027 | Assessment done, target design agreed, platform set up | Integration architect, BTP platform engineer, validation lead |
| Through 2027 | Interfaces built and tested in waves, GxP flows released under change control | CPI developers, PI/PO specialist, validation engineers |
| Late 2027 | Final waves live, PI/PO switched off or reduced to what extended maintenance covers | Integration support team, permanent |
If your assessment has not started, the architect is the first hire, because every other role depends on their plan. If you are already building, the bottleneck is usually developers who know both platforms, and validation capacity.
1.8
FAQ
Frequently asked questions
When does SAP PI/PO support end?
Mainstream maintenance for SAP Process Orchestration 7.5 ends on December 31, 2027. Optional extended maintenance runs through December 31, 2030. From 2031, PI/PO moves to customer-specific maintenance with no follow-on release.
What replaces SAP PI/PO?
SAP's recommended successor is SAP Integration Suite, its cloud integration platform on SAP Business Technology Platform. It includes Cloud Integration, API Management and event-driven integration. Some companies choose a non-SAP integration platform instead, but the interfaces have to be rebuilt either way.
Is SAP CPI the same as SAP Integration Suite?
Not quite. CPI, now called Cloud Integration, is the part of SAP Integration Suite that runs integration flows, and it is where most PI/PO interfaces end up. Integration Suite is the wider product that also includes API Management, Event Mesh and the migration tools.
How many SAP customers have migrated from PI/PO?
In November 2026, SAP put the number of PI/PO customers at 14,400, with about 3,400 already migrated to Integration Suite. Most customers still have the move ahead of them.
Do migrated interfaces need revalidation under GxP?
If an interface carries GxP data, moving it to a new platform is a change to a validated system, so it needs an impact assessment, testing and documentation under your change control. US GMP rules require checks on the accuracy of data going into and out of computer systems, and EU Annex 11 expects built-in checks for data exchanged between systems.
Can contractors do a PI/PO migration?
Yes, and many companies use contractors for the build and test waves, which have a clear end. They work under your procedures and need the same training records and named access as employees. The architect and the team that runs Integration Suite afterwards are usually better as permanent hires.
1.9
Next step
Hiring for your Integration Suite move
If your PI/PO migration needs a CPI developer, an integration architect or validation support, send us a hiring brief. Tell us whether you want permanent hires, contractors or both, and we'll come back with a shortlist of people who have done this work in regulated environments within 7 business days. You can also see how we work on our page for employers.
Image: Photo by Mikhail Nilov on Pexels.



















